Violations

22

Since Jan. 1, 2009

  • No violations
  • One or more violations

Violation Details

Samson Exploration Llc has been fined $None for violations in Pennsylvania (since Jan. 2009)

Inspection Date Code Type Resolved
1/20/2011 Polluting substance(s) allowed to discharge into Waters of the Commonwealth Environmental Health and Safety 3/31/2011
11/16/2010 Failure to restore well site within nine months after completion of drilling, failure to remove all pits, drilling supplies and equipment not needed for production. Administrative 8/11/2011
8/5/2010 Administrative Code-General Administrative 4/25/2011
8/5/2010 Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health and Safety 4/25/2011
8/5/2010 Impoundment not structurally sound, impermeable, 3rd party protected. Administrative 4/25/2011
8/5/2010 E&S Plan not adequate Administrative 4/25/2011
3/25/2010 Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health and Safety 5/20/2010
12/23/2009 E&S Plan not adequate Administrative 3/30/2010
10/8/2009 Failure to take all necessary measures to prevent spill. Inadequate diking, potential pollution Environmental Health and Safety 3/31/2011
10/8/2009 No Control and Disposal/PPC plan or failure to implement PPC plan Administrative 3/31/2011
10/8/2009 No Control and Disposal/PPC plan or failure to implement PPC plan Administrative 1/20/2011
10/8/2009 Discharge of pollultional material to waters of Commonwealth. Environmental Health and Safety 1/20/2011
10/8/2009 Failure to take all necessary measures to prevent spill. Inadequate diking, potential pollution Environmental Health and Safety 1/20/2011
10/1/2009 Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health and Safety 7/30/2010
10/1/2009 Failure to notify DEP of pollution incident. No phone call made forthwith Administrative 7/30/2010
10/1/2009 Stream discharge of IW, includes drill cuttings, oil, brine and/or silt Environmental Health and Safety 7/30/2010
10/1/2009 Stream discharge of IW, includes drill cuttings, oil, brine and/or silt Environmental Health and Safety 7/30/2010
10/1/2009 E&S Plan not adequate Administrative 7/30/2010
10/1/2009 Discharge of pollultional material to waters of Commonwealth. Environmental Health and Safety 7/30/2010
9/30/2009 Discharge of pollultional material to waters of Commonwealth. Environmental Health and Safety 7/30/2010
9/30/2009 Stream discharge of IW, includes drill cuttings, oil, brine and/or silt Environmental Health and Safety 7/30/2010
9/30/2009 Failure to notify DEP of pollution incident. No phone call made forthwith Administrative 7/30/2010

Tell Us About This Well

What should we know about this well? Share a story or upload a photo in the comment box below.