Shale Play

Natural Gas Drilling in Pennsylvania

Failure to fill all pits used to contain produced fluids or industrial wastes and remove unnecessary drilling supplies/equipment not needed for production within 9 months from completion of drilling of well.

Showing 3 violations on 3 active wells (since Jan. 2009).

Inspection Date Well Operator Resolved
1/9/2014 Storms 5H-5H Chesapeake Appalachia Llc 8/11/2014
12/13/2013 Ih S Bra 2H-2H Chesapeake Appalachia Llc 1/29/2014
11/13/2013 Zimmerli 05 074 01 D 1H-1H Talisman Energy Usa Inc